A pool in 10 days, where others said it could not be done.

As described in the project video, this 4×8 m steel-panel liner pool in Lapta, with fiberglass steps, was completed in 10 days. Explore the build in real project photos.

LocationLapta
Dimensions4 × 8 m
SystemPanel liner
Completed, illuminated 4×8 m panel-liner pool in Lapta
POOLS PLUS / CYPRUSLAPTA · 4 × 8 M
10 / COMPLETED
01 / THE PROJECT

From “a pool won’t work here” to a finished pool

The project photos show the concrete base, steel-panel shell, fiberglass steps, liner installation and water filling of the 4×8 m pool in Lapta. The project video states that the pool was completed in 10 days.

Liner installation and water filling at the 4×8 m panel-liner pool in Lapta
LAPTA · LINER AND WATER FILL
02 / BUILD STAGES

Real photos from the Lapta project.

Follow the 4×8 m pool from the concrete base and steel-panel shell through the fiberglass steps and water filling to the completed result.

LAPTA · PROJECT STORY

A project thought impossible, completed in 10 days.

Hear the project story in the video, from early doubts to the completed 4×8 m panel-liner pool with fiberglass steps.

LAPTA · PROJECT STORYAudio narration · 60 sec
Completed, illuminated 4×8 m panel-liner pool in Lapta
03 / COMPLETED POOL

4×8 m. Panel liner. Lapta.

The project was completed with a steel-panel shell, fiberglass steps and liner finish. The video narration gives a build time of 10 days.

Project overview
Lapta, Cyprus
4 × 8 m
Panel-liner pool
PROJECT FILE · LAPTA, CYPRUS

Let’s plan a pool that fits your garden.

Share your dimensions, intended use and project requirements with our team.

Explore pool constructionPOOLS PLUS CYPRUS · PROJECT 10