Photos from a reinforced-concrete pool project in Ozanköy showing reinforcement and pipework preparation, followed by pressure testing of the lines.
LocationOzanköy
Main categoryReinforced-concrete pool construction
SubcategoryInfrastructure installation

POOLS PLUS / CYPRUSOZANKÖY · INFRASTRUCTURE & PRESSURE TEST
01 / INFRASTRUCTURE & PRESSURE TEST
From reinforcement and pipework to pressure checks
The photos show reinforcement and formwork in the pool base and walls, pipe routes within the shell, and a pressure-testing setup with gauges.
Stages visible in the photos
- Reinforcement and formwork in the pool base and walls
- Pool pipework routed within the reinforced-concrete shell
- Pressure-test equipment connected to the pipework
- Pressure checks carried out using gauges
02 / PROJECT PHOTOS
Infrastructure and test stages in Ozanköy
View the pool infrastructure preparation and pressure-test setup from different angles.












PROJECT STAGES · OZANKÖY, CYPRUS
Pressure testing after infrastructure work
At Pools Plus, we pressure-test pool pipework after every infrastructure installation. This check helps identify possible leaks early and reduce the risk of problems for customers later.